Skip to main content

Working on the railroad

The railroad system that runs parallel to U.S. 90 in Jennings receives annual maintenance. Crews used a tie crane to move and manipulate the railway ties, a ballast regulator to shape and distribute gravel track ballasts and a tamping machine to pack the track ballast under the railway. These specialized machines were created to maneuver up and down the railway lines, similarly to trains.

 

PO Box 910 | 238 Market Street | Jennings, LA 70546 | 337.824.3011
PRINT ISSN 3069-4949
ONLINE ISSN 3069-4957