The railroad system that runs parallel to U.S. 90 in Jennings receives annual maintenance. Crews used a tie crane to move and manipulate the railway ties, a ballast regulator to shape and distribute gravel track ballasts and a tamping machine to pack the track ballast under the railway. These specialized machines were created to maneuver up and down the railway lines, similarly to trains.