Skip to main content

Coastal restoration board updated on New Orleans pump repairs and other projects

(The Center Square) — Louisiana’s Coastal Protection and Restoration Authority Board heard an update on work to fix corroded flood control pumps in New Orleans and a recap on coastal work in 2023.

U.S. Army Corps of Engineers Col. Cullen Jones told the board severe corrosion discovered on a flood control pump at the end of the London Avenue Canal in New Orleans has been fixed, and all 17 pumps in t…

PO Box 910 | 238 Market Street | Jennings, LA 70546 | 337.824.3011
PRINT ISSN 3069-4949
ONLINE ISSN 3069-4957